2008 - SANDOWN, NEW HAMPSHIRE
Porter Property Open Space 12 Lot Subdivision was granted conditional approval by the planning board. HBLA provided site planning and site design services for the first subdivision in Sandown to fall under their Open Space Development Ordinance. This 54 acre parcel dedicates 34 acres to conservation and includes restrictive covenants specifically drafted to help protect the environment.

2008 - HAVERHILL, MASSACHUSETTS
Construction for Merrimack Valley Hospice is well under way. For this project HBLA Inc. designed an 80’ x 80’, four season interior courtyard including pond and waterfall. HBLA introduced and coordinated for the client the donation of labor for the construction of the pond.

6-18-08 MANCHESTER, NEW HAMPSHIRE
St. Joseph Hospital opened its new Restorative Oncology Garden designed by HBLA Inc. HBLA provided design and construction observation services.

2008 - WESTON, MASSACHUSETTS
HBLA was engaged to design a 2,200 square foot interior courtyard for Epoch Senior Living and their new building addition for dementia.

3-10-08 FALMOUTH, MASSACHUSETTS
Atria Senior Living engaged HBLA Inc. to assist with the planning and design of their new 100 unit, assisted living facility located on Jones Pond. This project includes the planning and design of a 15 acre, deed restricted, conservation area which will be available to the general public.

2-20-08 FALMOUTH, MASSACHUSETTS
HBLA was engaged to provide site design for Wise Living at Woods Hole, a 40 unit, independent senior living project. This project required a sensitive site design in order to incorporate the first geodesic dome designed by Buckminster Fuller in the early 1950’s.

10-23-07 Kensington, New Hampshire
Sawyer Park site is graded and competition sports fields are being sodded. This 2 million dollar community park was designed, permitted and constructed in just three months.

10-18-07 Kensington, New Hampshire
The permit set for Sawyer Field a competition softball field associated with Sawyer Park has been submitted to the State.

7-6-07 Portsmouth, New Hampshire
Planning Board approves Westin Hotel and Conference Center with HBLA streetscape improvements including the custom Paver-Grate detail for all street trees.

6-15-07 – Portsmouth, New Hampshire
Construction completed for the new Hilton Hotel and Harbour Hill condominiums including Portsmouth’s first Paver-Grate urban tree planting system. HBLA developed a custom tree planting detail that allows Portsmouth’s standard brick sidewalk to come right up to tree trunk maintaining City sidewalk clearance requirements - destined to become a City standard.

6-8-07 – Wallingford, Connecticut
Construction drawings released for dementia garden and site work associated with Pond Ridge, a Continuous Care Retirement Community.

3-14-07 – Tamarindo, Costa Rica
HBLA takes first ever office surfing retreat to take in the culture, landscape, and warm waters of Costa Rica.

1-19-07 Keene, New Hampshire
The New Hampshire Chapter of the American Institute of Architects awards HBLA its highest honor, the People’s Choice Award for Excellence for Lakeside Manor. HBLA designed the master plan for the estate and the award committee noted how well the grand mansion blended with its surroundings. Recently, the current French Prime Minister vacationed at the estate.

2-27-06 – Portsmouth, New Hampshire
HBLA issued construction documents for the new Hilton / Harbour Hill downtown project including streetscape public improvements.

2-20-06 – Dover, New Hampshire
HBLA began construction documentation for Villa Como, a riverfront estate.

2-15-06 – Westwood, Massachusetts
Planning board approval drawings were issued by HBLA for High Rock Village, a 150 unit independent senior living housing project.

2-6-06 – Ogunquit, Maine
Rivermouth, blue skies, overhead, offshore and only three people out.  A day to remember.

1-28-06 – Allentown, Pennsylvania
Construction began on Good Shepherd’s multi-million dollar healthcare campus, central park and new ambulatory care center.  Designed by HBLA the project now enters into the construction administration phase.

1-15-06 – Hazleton, Pennsylvania
HBLA began work on Anchor Health Properties new medical office and rehabilitation facility.

1-5-06 – Kittery, Maine
HBLA began site planning and design of Mead Farm, a country estate.